FLS-023 - Ver 1.0 (Jun 23)
Confidential & Proprietary | 2023 CBRE Inc.
Fire Life Safety
Sample SOW
Contracting
Page 1 of 1
Sample Scope of Work
- The chart below lists the industry standard terms for FLS maintenance
- These terms can vary slightly from supplier to supplier or regionally
- Service levels vary by the numbers of services, timing of these services, and additional coverages included
Description of Service
CBRE Technician Self Perform
Service Level
Fire Extinguishers
- Various visual inspections:
- Last hydrostatic test date
- Pressure gauge
- Shell corrosion
Link to Scopes of Work
Fire Hose / Hydrants
Fire Sprinklers
Backflow Preventers
Fire Alarm Systems
- Standard Scope of Work
- High level scope of work typical for most sites
- Detailed Scope of Work
- Includes a Scope of Work for nearly every piece of FLS equipment
- Inspection of various components:
- Fire hose, couplings and nozzles
- Verify that there is no damage caused by chemicals, burns, cuts, abrasions or vermin
- Interior linear at each end for any physical signs of linear delaminating
- Hoses for the current test psi
- Ensure the location of the hose is sufficient and verify it is not blocked
- Hydrostatic test
- Hydrostatic test
- Flow Hydrants for proper flow and pressure.
- Inspect various components:
- Risers for water leaks
- No obstructions or damage
- Gauges and alarm bells
- Control Valves
- Test various components:
- Open / shut indicators
- Three-way valve is open
- Static psi
- Annual inspection by licensed plumber
- Inspect various components:
- Fire alarm control panel
- Manual pull stations
- Heat detectors
- Test various components:
- Audible alarm bells
- Smoke detectors
Special Hazards Fire Suppression Systems
- Inspect various components:
- Releasing panel
- Manual pull stations
- Audio video device
- Testing:
- Foam systems
- Functional testing
Kitchen Hoods Fire Suppression Systems
- Inspect various components:
- Signs the system has been fired
- Chemical type & quantity
- Linkage cable for fraying
- Regulator test date
- Pull station
- Testing:
- Gas valve operation
- Weigh activation cartidges
- Full function test of system
- Dry test
Emergency / Exit Lights
- Inspect various components:
- Exterior housing for physical damage
- Lamps are lit and properly aimed
- Battery voltage
- Testing:
- 30 second push test
- Operational test of batteries and lighting system for 90 minutes
Fire Pumps
- Type of Driver Diesel or Electric
- Check Rating, GPM and PSI
Link: FLS Standard SOW
Link: FLS Detailed SOW