While many FLS testing and inspection activities are performed at least once per year, there are several tasks that need to be performed less frequently. Do not allow these activities to surprise your client with an unbudgeted expense. Work with your fire protection system maintenance provider to help you budget for these periodic costs.
Component
Specific Inspection
Frequency
Cylinders – Visual inspection
5 Year
Strainers – Visual inspection
Filters – Visual inspection
Orifices – Visual inspection
Interior Check Valves – Visual inspection
Interior Alarm – Visual inspection
5 Year
Dry Sprinkler Valves – Visual inspection
Deluge Sprinkler Valves – Visual inspection
Pre-Action Valves – Visual inspection
Battery Replacement
Dry System Flow Trip Test
Dry System Air Leakage Test
Discharge Hose Test
Check Valve Test
Replace Initiators
Hydrostatic Testing of Carbon Dioxide, Wet Chemical, and Foam
Hydrostatic Testing of Cartridges associated with Portable Fire Extinguishers and Wheeled Units
Hydrostatic Testing of Carbon Dioxide Hoses Equipped With A Shut-Off Valve
Clean Agent Suppression
Sprinklers
Sprinklers
Sprinklers
Sprinklers
Sprinklers
Sprinklers
Sprinklers
Sprinklers
Fire Alarm
Sprinklers
Sprinklers
Clean Agent Suppression
Clean Agent Suppression
Clean Agent Suppression
Portable Fire Extinguishers
Portable Fire Extinguishers
Sprinklers
Sprinklers
Sprinklers
Sprinklers
Standpipe
Standpipe
Standpipe
Standpipe Hoses
Valves / Valve Components
Private Fire Service
Portable Fire Extinguishers
Clean Agent Suppression
Hood Suppression System
Hood Suppression System
Hood Suppression System
Portable Fire Extinguishers
Portable Fire Extinguishers
Sprinklers
Sprinklers
Sprinklers
Gauges – Test or Replace
Extra-High Temperature / Corrosive Atmosphere
Check Valves – Test or Replace
Internal Obstruction inspection
Full Flow Test – Remote Point
Hose Connection Pressure Reducing Valves (Full Flow)
Hydrostatic Testing – Manual or Dry Standpipes
Hose Test
Pressure Reducing Valves / Relief Valves (Full Flow)
Full Flow Test
Stored-Pressure Extinguisher – Internal Examination
Replace CGA (Compressed Gas Actuator)
Hydrostatic Testing, Cylinder, Cartridge Replacement, and Regulator Test
Wet Chemical Containers
Hose Assemblies
Hydrotest of Dry Chemical and Clean Agent Extinguishers
Hydrotest of Dry Chemical Hose Equipped with Shut-Off Valve
Replace Sprinkler Head (Standard Wet System)
Replace Sprinkler Head (Dry System)
Replace Sprinkler Head (Quick Response System)
5 Year
5 Year
5 Year
5 Year
5 Year
5 Year
3-5 Years, per Manufacturer Recommendation
3 Year
3 Year
5 Year
5 Year
5 Year
5 Year
5 Year
5 Year
5 Year
5 Year
5 Year
5 Year
5 Year
5 Year
5 Year
5 Years For New Hoses, Every 3 Years Thereafter
5 Year
5 Year
6 Year
10 Year
12 Year
12 Year
12 Year
12 Year
12 Year
After 50 Years and Every 10 Years Thereafter
Every 10 Years
After 20 Years and Every 10 Years Thereafter